Renovating while you live there is perfectly doable, as long as you make agreements in advance about planning, dust and the rooms you will keep using. Most renovations, such as an extension, an attic room or new window frames, can go ahead while you are at home. It gets harder when the kitchen or bathroom is out of use for a while. Clear phasing and one fixed point of contact then make all the difference. Below you can read how to keep the renovation liveable.
In most cases, yes. An extension is largely built outside; only at the end is the existing facade opened up. An attic conversion takes place on a floor you hardly use anyway.
It gets tougher when the whole house is tackled at once, or when there is no water, power or heating for a longer period. In that case, consider staying elsewhere for a week or two during the heaviest phase.
Dust is the biggest annoyance in any renovation. Good screening helps a lot: dust walls with a zip door, taped-up doors and protected floors along the walking routes. Demolition work, such as removing a load-bearing wall, releases the most dust.
Put fragile items away beforehand and cover the rest. An extractor or air purifier in the work area reduces the fine dust that spreads through the house.
If the kitchen is being renovated, set up a temporary kitchen with a fridge, microwave, kettle and somewhere to wash up. With a new bathroom, a second toilet or shower in the house is worth a lot. If there is none, ask beforehand when water and drainage will work again.
Coordinate the order, so the kitchen and bathroom are not out of use at the same time. Good planning prevents you from being without facilities for longer than necessary.
Agree working hours in advance and when the noisy work takes place. Also discuss where materials are stored, where the skip goes and which toilet the tradespeople use.
With us you have one dedicated project manager, from discussing your wishes to completion. So you always know who to turn to if something changes or you have a question. Read more about us.
A building site in the house is no playground. Keep the work area closed off, also after working hours, and watch out for tools, open pipes and holes in the floor or facade.
Inform the neighbours before the work starts as well. A short note with the schedule prevents a lot of irritation, especially if a skip or scaffolding is placed in the street. Curious what a renovation roughly costs? See what does a renovation cost.
Deliberately plan the heaviest weeks around a holiday or a few days away. A week away from home during demolition and dust makes the rest of the renovation a lot more pleasant.
That varies widely. An attic room or new bathroom often takes a few weeks, an extension easily several months including preparation. With the quote we draw up a realistic schedule, so you know where you stand.
It is not always compulsory, but it is wise. A skip, scaffolding or noise affects the neighbours too. If scaffolding or a skip is placed on the public road, you often need a permit or notification from the municipality.
You can, but expect noise, especially during demolition and drilling. Ask which days will be the noisiest and work elsewhere on those days. On quieter days, a room far from the work area with the door closed helps.
In existing homes you sometimes come across surprises, such as wood rot or outdated pipework. A good contractor reports this immediately and discusses the options and costs before carrying on. How to arrange this in advance is explained in choosing a contractor and comparing quotes.
Call or message us with your question. We are happy to visit and look at your situation, free of charge.
Request a quote Get in touchCall or message Richard Vlieland on +31 6 11 78 63 20, or request a free quote. We are happy to come and have a look.
Request a quote More information