What is the cost of removing a load-bearing wall?

The cost of removing a load-bearing wall for a typical opening of 3 to 4 metres in a terraced house is roughly between €3,000 and €8,000, including structural engineer, steel beam, propping and rough finish (indication, 2026 price level, including VAT).

  • One fixed contact, from idea to completion
  • Drawings, permit and construction
  • Large network of skilled tradespeople
Google-rating: 5.0 from 5 reviews★★★★★
Build your quote

Put together your quote

A free, no-obligation quote tailored to you in just a few clicks. You finish on the quote page, where everything is already filled in.

The bare flat roof before the work in Amsterdam The same roof after completion: roof extension with a timber roof terrace BeforeAfter
12345
Step 1 of 5

What is it about?

Feel free to choose more than one option.

What is the situation?

So we know what to take into account.

When would you like to start?

An estimate is fine.

Add photos? (optional)

An overview photo and a few detail shots make our advice much more specific. You can also skip this.

Where should we send the quote?

You will receive a personal reply quickly.

Free and no obligationDone in 1 minuteReply within 24 hours
The short answer

The cost of removing a load-bearing wall for a typical opening of 3 to 4 metres in a terraced house is roughly between €3,000 and €8,000, including structural engineer, steel beam, propping and rough finish (indication, 2026 price level, including VAT). If a wider wall comes out, with columns and their own pad foundations, allow €8,000 to €15,000 or more. Plastering, floor repairs and painting often come on top. A tailored quote follows after a visit on site.

What does it cost to remove a load-bearing wall?

When a load-bearing wall is removed, a steel beam takes over the load the wall carried. That beam rests on solid bearings at both ends. The costs depend mainly on the span, the weight resting on it and how the beam can transfer its load.

Which work is involved in such an opening, you can read in removing a load-bearing wall.

  • Opening of 2 to 3 metres: roughly €2,500 to €5,000
  • Opening of 3 to 4 metres in a terraced house: €3,000 to €8,000
  • Wide opening with columns and pads: €8,000 to €15,000 or more
  • Structural engineer, if quoted separately: €500 to €1,500

What does the cost of removing a load-bearing wall depend on?

The span is the most important factor: the wider the opening, the heavier the beam. What sits above the wall counts too. Does the wall carry only a floor, or also a second storey and the roof? The more weight, the heavier the section and the bearings.

Sometimes the existing wall cannot carry the beam where it bears. Then steel columns are needed to take the load down to the foundations, possibly with a new pad foundation. In Noord-Holland, where the ground is often soft, the structural engineer works this out carefully.

  • Width of the opening and weight of what sits above
  • Type of floor: timber joists or a concrete floor
  • Bearings in existing walls or new columns and pads
  • Pipes and cables in the wall that need rerouting
  • Fire-resistant cladding of the steel beam

What is and is not included in the price?

A price for removing a load-bearing wall usually covers the structural engineering work, propping the floor above, the demolition, placing the beam and making good around the bearings. Finishing such as plastering, repairing the floor where the wall stood and painting is often priced separately.

Also ask whether the beam stays visible or is concealed in the ceiling. Concealing looks calmer, but costs more. Sometimes a bulkhead is a neat way to box in a beam or pipes.

Do you need permission to remove a load-bearing wall?

You cannot simply alter the load-bearing structure. Since the Environment and Planning Act came into force on 1 January 2024, changing the structure often requires a notification to the municipality, backed up by the structural engineer. For a listed building a permit is usually needed. Check it via the Omgevingsloket or have it arranged for you. See also a permit for a renovation.

Removing a load-bearing wall is often part of a larger renovation or an extension in which the rear wall is opened up. Bouwbedrijf R. Vlieland includes this in the plan, with one dedicated project manager from design to finish. Read more under renovation and what a renovation costs, or ask for a tailored quote after a no-obligation conversation.

Frequently asked questions

How long does it take to remove a load-bearing wall?

The work itself often takes one to three days: propping, demolishing, placing the beam and making good the bearings. Plastering and floor repairs follow. The preparation with the structural engineer and the notification takes longer than the work itself.

Can I remove a load-bearing wall myself?

That is strongly discouraged. A mistake in the propping or the bearing can lead to cracks or worse. Have the structural work done by an engineer and the building work by professionals.

How do I know whether a wall is load-bearing?

Look at the direction of the floor joists: a wall the joists rest on is usually load-bearing. The thickness and the position in the house also say something. Only an expert can give certainty, ideally with the building drawings to hand.

Want to know what it costs in your situation?

Every home is different. After a free, no-obligation visit you receive a clear, tailored quote.

Request a quote Get in touch

Read more

Plans for your home?

Call or message Richard Vlieland on +31 6 11 78 63 20, or request a free quote. We are happy to come and have a look.

Request a quote More information
Make a request