The cost of removing a load-bearing wall for a typical opening of 3 to 4 metres in a terraced house is roughly between €3,000 and €8,000, including structural engineer, steel beam, propping and rough finish (indication, 2026 price level, including VAT).
A free, no-obligation quote tailored to you in just a few clicks. You finish on the quote page, where everything is already filled in.
BeforeAfter
The cost of removing a load-bearing wall for a typical opening of 3 to 4 metres in a terraced house is roughly between €3,000 and €8,000, including structural engineer, steel beam, propping and rough finish (indication, 2026 price level, including VAT). If a wider wall comes out, with columns and their own pad foundations, allow €8,000 to €15,000 or more. Plastering, floor repairs and painting often come on top. A tailored quote follows after a visit on site.
When a load-bearing wall is removed, a steel beam takes over the load the wall carried. That beam rests on solid bearings at both ends. The costs depend mainly on the span, the weight resting on it and how the beam can transfer its load.
Which work is involved in such an opening, you can read in removing a load-bearing wall.
The span is the most important factor: the wider the opening, the heavier the beam. What sits above the wall counts too. Does the wall carry only a floor, or also a second storey and the roof? The more weight, the heavier the section and the bearings.
Sometimes the existing wall cannot carry the beam where it bears. Then steel columns are needed to take the load down to the foundations, possibly with a new pad foundation. In Noord-Holland, where the ground is often soft, the structural engineer works this out carefully.
A price for removing a load-bearing wall usually covers the structural engineering work, propping the floor above, the demolition, placing the beam and making good around the bearings. Finishing such as plastering, repairing the floor where the wall stood and painting is often priced separately.
Also ask whether the beam stays visible or is concealed in the ceiling. Concealing looks calmer, but costs more. Sometimes a bulkhead is a neat way to box in a beam or pipes.
You cannot simply alter the load-bearing structure. Since the Environment and Planning Act came into force on 1 January 2024, changing the structure often requires a notification to the municipality, backed up by the structural engineer. For a listed building a permit is usually needed. Check it via the Omgevingsloket or have it arranged for you. See also a permit for a renovation.
Removing a load-bearing wall is often part of a larger renovation or an extension in which the rear wall is opened up. Bouwbedrijf R. Vlieland includes this in the plan, with one dedicated project manager from design to finish. Read more under renovation and what a renovation costs, or ask for a tailored quote after a no-obligation conversation.
The work itself often takes one to three days: propping, demolishing, placing the beam and making good the bearings. Plastering and floor repairs follow. The preparation with the structural engineer and the notification takes longer than the work itself.
That is strongly discouraged. A mistake in the propping or the bearing can lead to cracks or worse. Have the structural work done by an engineer and the building work by professionals.
Look at the direction of the floor joists: a wall the joists rest on is usually load-bearing. The thickness and the position in the house also say something. Only an expert can give certainty, ideally with the building drawings to hand.
Every home is different. After a free, no-obligation visit you receive a clear, tailored quote.
Request a quote Get in touchCall or message Richard Vlieland on +31 6 11 78 63 20, or request a free quote. We are happy to come and have a look.
Request a quote More information