Having a new bathroom fitted usually takes a few weeks, from demolition to the last sealant joint. You make the most important choices beforehand: the layout, the position of drains and pipes, and whether the bath stays or makes way for a spacious walk-in shower. If you settle those choices properly, you avoid surprises during the work. A bathroom is technical work with water, electrics and ventilation, and it is the hidden parts that decide whether it lasts for years. Below you can read how the process works.
First the old bathroom is stripped out, down to the bare floor and walls if needed. Then pipes and drains are adapted, the electrics are installed and the walls and floor are prepared. Only then do tiling, sanitary ware and finishing follow.
A fixed sequence prevents tradespeople from having to wait for each other.
The position of the drain decides a lot. Moving the toilet and shower is possible, but needs room for a fall in the floor or a raised floor. In a small bathroom, a walk-in shower with a glass screen makes the space feel larger.
Pipes that cannot go into the wall can be neatly concealed in a bulkhead or false wall. How that works is explained in making a bulkhead.
Water belongs where it belongs. Under the tiles in the shower area goes a waterproofing layer, with sealing tape in the corners and around penetrations. Sealant joints are maintenance; the waterproofing behind them is the real protection.
Electrics in a bathroom must meet stricter requirements: circuits with a residual current device and appliances suitable for the zone they are in. Good mechanical ventilation is needed as well, otherwise mould gets free rein.
For an average bathroom, two to four weeks of work is often assumed, depending on the size and how much is being moved. Delivery times for tiles and sanitary ware come on top, so order in good time.
If you live at home during the renovation, arrange an alternative for showering. You will find tips in renovating while you live there. With us, one dedicated project manager keeps an eye on the schedule of all tradespeople.
The price depends on the size, the sanitary ware, the tiling and how much pipework changes. Rough ranges, with what you get for them, are listed at the cost of a bathroom renovation. Read more about VAT in renovation and VAT.
A bathroom is often part of a larger refurbishment or renovation. Combining them often saves time and money, because the tradespeople are there anyway.
Fix the position of shower, toilet and washbasin before you choose tiles. The technology determines the layout, and the layout determines how many tiles you need and in which size.
That is possible by arrangement. Do agree in advance who is responsible for dimensions, delivery and any defects. That way you avoid discussion if a part does not fit or arrives damaged.
Usually not, because it is a renovation inside the home. If you remove a load-bearing wall or live in a listed building, it is a different matter. If in doubt, check with the municipality or via the Omgevingsloket.
It can, but drainage is the biggest challenge. The new drain has to connect properly to the soil stack, with enough fall. We assess beforehand what is technically possible and what that means for the rest of the home.
Make sure there is a good waterproofing layer under the tiles, mechanical extraction that runs often enough and a vent or gap under the door for air supply. Let the extractor keep running for a while after showering.
Call or message us with your question. We are happy to visit and look at your situation, free of charge.
Request a quote Get in touchCall or message Richard Vlieland on +31 6 11 78 63 20, or request a free quote. We are happy to come and have a look.
Request a quote More information